|
Control system upgrade for the Power generation Units at Asab & Bab, GASCO
Control system upgrade for the Power generation Units at Asab & Bab, GASCO
|
|
|
Upgrade of Load sharing system & Load distribution at Zirku island, ZADCO
Upgrade of Load sharing system & Load distribution at Zirku island, ZADCO
|
|
|
Upgrading of Khorfakan & Kalba power station Speedtronic control system, SEWA
Upgrading of Khorfakan& Kalba power station Speedtronic control system, SEWA
|
|
|
Replacement of Gas Turbine (Frame 5) Excitation system for Generators 4021 GTG 01& 4022 GTG 02 (GUP)
Replacement of Gas Turbine (Frame 5) Excitation system for Generators 4021 GTG 01& 4022 GTG 02 (GUP) at ADNOC Ruwais Refinery, TAKR
|
|
|
Upgrading of BN 3300 Vibration monitoring system
Upgrading of BN 3300 Vibration monitoring system for the Critical equipments at Ruwais Refinery, TAKREER
|
|
|
Replacement of Gamma ray Level Instrument at Um Al Nar Refinery, TAKREER
Replacement of Gamma ray Level Instrument at Um Al Nar Refinery, TAKREER
|
|
|